Indicators
- 01Pet area that will not drain or stay clean
- 02Want a putting green at home
- 03Yard area where grass will not fill in
- 04Existing turf laid without a proper base
Procedure
The base comes first: excavate, install and compact base material in lifts, and shape it so water moves instead of pooling. Drainage is built into that base, not added afterward. Turf is then laid to the finished grade, seamed, and secured at the perimeter. Where a proper install calls for it, we set mortared hardscape edging so the edges stay put rather than lifting.
Sample written report available on request.
Coverage
Residential & Commercial
Documentation
Service report each visit